DEZ FURNISHINGS Ultra Soft Plush Fleece Throw Blanket, Double Sided Cozy Thick Warm Blanket for Sofa & Bed, King (108" x 90"), Beige - color: Beige, size: King (108" x 90")
DEZ FURNISHINGS Ultra Soft Plush Fleece Throw Blanket, Double Sided Cozy Thick Warm Blanket for Sofa & Bed, King (108" x 90"), Beige - color: Beige, size: King (108" x 90")
About this item
- 100% Polyester
- Thicker & Warmer Comfort – This thick plush blanket is made with premium heavyweight fleece, designed to wrap you in extra warmth and cozy softness. The fabric is also skin-friendly, offering a gentle touch that feels safe and comfortable for all ages. Perfect as a warm throw blanket for cold nights or everyday comfort.
- Ultra-Soft Double Sided Plush – Enjoy the same velvety softness on both sides with our ultra soft blanket. This reversible plush throw works perfectly as a double sided fleece blanket for bed, sofa, or couch lounging, while staying gentle on skin for a relaxing experience.
- Versatile Everyday Blanket – Use this sofa blanket as a stylish bed cover, a couch throw blanket, or a cozy layer for travel. Ideal as an all season blanket, especially for fall and winter snuggles.
- Cozy Gift Choice – A thoughtful gift blanket for housewarmings, birthdays, or holidays. This classic ivory fleece blanket doubles as a holiday throw blanket, adding warmth and style to any home décor.
- Durable & Easy Care – Built to last, this machine washable blanket features strong stitching and fade-resistant fabric. A durable throw blanket that stays soft wash after wash, while resisting pilling and shedding.
Overview
- Material: Polyester
- Color: Beige
- Brand: DEZ FURNISHINGS
- Special Feature: Durable, Fade Resistant, Fluffy, Hypoallergenic, Skin Friendly
- Style: Contemporary
Couldn't load pickup availability
Low stock: 10 left
View full details

Reviews
-
⭐⭐⭐⭐⭐
Emily Carter – Seattle, Washington
Shopping with Aptora was simple from beginning to end. The product information was clear, ordering was easy, and everything arrived in good condition. The item looked consistent with what I saw online and worked well in my space. Overall, I am very pleased with the experience.
-
⭐⭐⭐⭐⭐
Daniel Brooks – Austin, Texas
I was looking for something practical without making the room feel crowded, and Aptora had several useful options. The ordering process was straightforward, and the product was easy to set up once it arrived. It feels well suited to everyday use, and I would shop here again.
-
⭐⭐⭐⭐⭐
Rachel Morgan – Denver, Colorado
My order arrived carefully packaged and matched the description on the website. I appreciated that the product details made it easier to choose the right option before purchasing. Everything fits naturally into my home, and the overall quality and shopping experience met my expectations.
-
⭐⭐⭐⭐⭐
Kevin Parker – Portland, Oregon
Aptora offers a nice selection of practical products for improving everyday spaces. The website was easy to browse, checkout was quick, and I received helpful order updates. The item I selected has been useful and looks great in the room. I am happy with my purchase overall.
New Arrivals
-
Vesgantti 119" Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 3 Seater Flexible Layout Sofa, Boneless Couch for Living Room & Apartment, No Assembly Required, Grey - color: 119" - 3 Seater Grey
Regular price $547.78 USDRegular priceSale price $547.78 USD -
MoonRest® Synthetic Down Alternative 14x28 Lumbar Pillow Insert Form, for Decorative Throw Pillow, Sofa, Cushions, Body and Bed - Pack of 2- Size 14” X 28” - style: 2 PACK - 14 x 28
Regular price $77.99 USDRegular priceSale price $77.99 USD -
Vesgantti 119" Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 3 Seater Flexible Layout Sofa, Boneless Couch for Living Room & Apartment, No Assembly Required, Black - color: 119" - 3 Seater Black
Regular price $547.78 USDRegular priceSale price $547.78 USD -
ZEYU Wall Hooks, 10Pcs Coat Hooks Hardware Towel Hooks for Hanging Coats Double No Rust Black Robe Hooks Wall Mounted with Screws for Key, Towel, Bags, Cup, Hat - color: 10Pcs Silvery
Regular price $21.56 USDRegular priceSale price $21.56 USD -
Vesgantti 119" Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 3 Seater Flexible Layout Sofa, Boneless Couch for Living Room & Apartment, No Assembly Required, Beige - color: 119" - 3 Seater Beige
Regular price $547.78 USDRegular priceSale price $547.78 USD -
ZEYU Wall Hooks, 20Pcs Coat Hooks Hardware Towel Hooks for Hanging Coats Double No Rust Black Robe Hooks Wall Mounted with Screws for Key, Towel, Bags, Cup, Hat - color: 20Pcs Silvery
Regular price $31.52 USDRegular priceSale price $31.52 USD -
Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey - color: 119" - 3 Seater & Ottoman Grey
Regular price $630.78 USDRegular priceSale price $630.78 USD -
ZEYU Wall Hooks,10Pcs Coat Hooks Hardware Towel Hooks for Hanging Coats Double No Rust Black Robe Hooks Wall Mounted with Screws for Key, Towel, Bags, Cup, Hat - color: 10Pcs Black
Regular price $16.58 USDRegular priceSale price $16.58 USD -
Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Black - color: 119" - 3 Seater & Ottoman Black
Regular price $663.98 USDRegular priceSale price $663.98 USD -
Metal Garage Storage Cabinets with Wheels,Steel Tool Cabinets Lock Door and Adjustable Shelves for Home,Office,Warehouse Organisieren (Black, 75" H) - color: Black, size: 16"D x 32"W x 74.41"H
Regular price $265.58 USDRegular priceSale price $265.58 USD -
ZEYU 20Pcs Wall Hooks, Coat Hooks Hardware Heavy Duty Hooks for Hanging Coats Double No Rust Black Hook Wall Mounted with Screws for Key, Towel, Bags, Cup, Hat - color: 20Pcs Black
Regular price $31.52 USDRegular priceSale price $31.52 USD -
Mavivegue Portable Closet, 50 Inch Wardrobe Closet | Portable Closets for Hanging Clothes with 3 Hanging Rods and 6 Storage Shelves for Bedroom, Black - color: Black, size: 50" W x 17" D x 64" H
Regular price $46.46 USDRegular priceSale price $46.46 USD -
HOOBRO Small Round Side Table with Charging Station, 3-Tier Round Bamboo End Table, Compact Sofa Bedside Table for Small Space, Easy Assembly, for Living Room, Bedroom, Apartment, Walnut WL152UBZ01 - color: Walnut
Regular price $66.38 USDRegular priceSale price $66.38 USD -
Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Beige - color: 119" - 3 Seater & Ottoman Beige
Regular price $663.98 USDRegular priceSale price $663.98 USD -
Mavivegue Portable Closet Wardrobe, Clothes Organizer with 4 Hanging Rods, Non-Woven Fabric Cover, Large Capacity Storage for Bedroom and Living Room,Gray, 67" W x 17" D x 67" H - color: Grey, size: 67"W x 17"D x 67"H
Regular price $58.08 USDRegular priceSale price $58.08 USD -
Mavivegue Portable Closet,Wardrobe Closet,Wardrobe,Portable Closets | for Hanging Clothes,for Bedroom and Living Room, Black, 2 Rows, 34"W x 18"D x 64"H - color: Black, size: 34"W x 18"D x 64"H
Regular price $36.50 USDRegular priceSale price $36.50 USD -
HOOBRO Small Round Side Table with Charging Station, 3-Tier Round Bamboo End Table, Compact Sofa Bedside Table for Small Space, Easy Assembly, for Living Room, Bedroom, Apartment, Natural YL152UBZ01 - color: Natural
Regular price $58.08 USDRegular priceSale price $58.08 USD -
Vesgantti 119" Oversized U-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Convertible Sofa with 2 Ottomans, Boneless Couch, No Assembly Required, Grey - color: 119" - 3 Seater & 2 Ottoman Grey
Regular price $780.18 USDRegular priceSale price $780.18 USD
FAQ
What types of products does Aptora sell?
Aptora offers compact furniture, storage solutions, lighting, textiles, home décor, and organization products designed for studio apartments, smaller rooms, and multifunctional living spaces.
How much does shipping cost?
Aptora charges a flat shipping fee of $6.90 per order. If your order is divided into multiple shipments, you will not be charged an additional standard shipping fee solely because the items ship separately.
How long will my order take to arrive?
Orders are typically processed within 1–3 business days. Estimated delivery after shipment is generally 5–10 business days within the United States and 10–20 business days for supported international destinations. These are estimates and may vary depending on the product, destination, carrier, customs processing, and other delivery conditions.
How can I track my order?
Once your order ships, we will send a shipping confirmation email with available tracking information. Tracking updates may take approximately 2–5 days to appear after shipment because of carrier processing or transfers between logistics providers.
Why did I receive only part of my order?
Products in the same order may be stored at different fulfillment locations and shipped separately. Each package may have its own tracking number and delivery date. Please review all shipping confirmation emails before reporting a missing item.
Can I change or cancel my order?
You may request an address change, order modification, or cancellation within 12 hours of purchase by emailing nioursfaseqw@gmail.com. Requests are not guaranteed because orders may enter processing shortly after they are placed. A cancellation is complete only after Aptora confirms it in writing.
What should I check before ordering furniture?
Please review the product dimensions, materials, weight capacity, assembly requirements, and included components. Measure your room, floor space, doorways, hallways, stairways, elevators, and other delivery access points before ordering. Returns caused by insufficient space or access may be treated as change-of-mind returns.
Do Aptora products require assembly?
Some furniture and storage products may require assembly, mounting, or installation. Assembly requirements are generally listed on the product page. Unless expressly stated otherwise, professional assembly and installation are not included. Always follow the supplied instructions and use qualified assistance when electrical work, wall mounting, or structural support is involved.
What is your return policy?
Eligible products may be returned within 30 calendar days of delivery. Products must generally be unused, unwashed, uninstalled, unaltered, and returned with their original packaging, accessories, hardware, and instructions. Furniture should normally remain unassembled for a change-of-mind return. Contact us before returning anything because all returns require prior written authorization.
What should I do if my item arrives damaged, defective, incorrect, or incomplete?
Email nioursfaseqw@gmail.com as soon as possible with your order number, a description of the issue, and clear photographs of the product, packaging, shipping label, and affected area. We recommend reporting visible damage within 7 calendar days of delivery. Please keep all packaging, accessories, and hardware until your claim has been reviewed.
Blogs & Tips
View all-
The Open Bound: 5 Critical Rules for Using Open...
Stop suffocating your small studio layout with dark solid screens and heavy curtains. This practical interior guide reveals the 5 essential design rules for using open shelving units as high-performance...
The Open Bound: 5 Critical Rules for Using Open...
Stop suffocating your small studio layout with dark solid screens and heavy curtains. This practical interior guide reveals the 5 essential design rules for using open shelving units as high-performance...
-
The Hidden Footprint: 5 Brilliant Rules for Org...
Stop letting valuable bedroom real estate go to waste under a pile of dust bunnies. This practical organization guide reveals the 5 essential rules for engineering a high-capacity under-bed storage...
The Hidden Footprint: 5 Brilliant Rules for Org...
Stop letting valuable bedroom real estate go to waste under a pile of dust bunnies. This practical organization guide reveals the 5 essential rules for engineering a high-capacity under-bed storage...
-
The Divider Illusion: Five Secrets to Splitting...
Stop letting your bed face your kitchen stove. Discover how to use double-sided open shelving to create distinct, stylish zones in your studio apartment while keeping your space bright, airy,...
The Divider Illusion: Five Secrets to Splitting...
Stop letting your bed face your kitchen stove. Discover how to use double-sided open shelving to create distinct, stylish zones in your studio apartment while keeping your space bright, airy,...

















