Skip to product information
1 of 9

Winsome Suzanne Kitchen Table Set with Stools, Coffee, 33" | Convenient Sturdy Mobile Kitchen & Dining Room Table & Chairs with Storage for Small Spaces, Dorms, Apartments - color: Coffee Finish

Winsome Suzanne Kitchen Table Set with Stools, Coffee, 33" | Convenient Sturdy Mobile Kitchen & Dining Room Table & Chairs with Storage for Small Spaces, Dorms, Apartments - color: Coffee Finish

Regular price $289.22 USD
Regular price Sale price $289.22 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.

About this item

  • Dimensions (W x D x H): 29.61 in x 29.13 in x 32.75 in
  • Drop Leaf to expand table size | Stools tuck neatly under the table
  • Set rolls easily on casters
  • Two drawers with cut-out handles
  • Made of Solid and Composite Wood
  • Included Components: Table, Stools

Overview

  • Color: Coffee Finish
  • Brand: Winsome
  • Size: 29.61x29.13x32.76
  • Item Weight: 52.1 pounds
  • Style: Modern
Quantity

Low stock: 10 left

View full details
  • ⭐⭐⭐⭐⭐

    Emily Carter – Seattle, Washington

    Shopping with Aptora was simple from beginning to end. The product information was clear, ordering was easy, and everything arrived in good condition. The item looked consistent with what I saw online and worked well in my space. Overall, I am very pleased with the experience.

  • ⭐⭐⭐⭐⭐

    Daniel Brooks – Austin, Texas

    I was looking for something practical without making the room feel crowded, and Aptora had several useful options. The ordering process was straightforward, and the product was easy to set up once it arrived. It feels well suited to everyday use, and I would shop here again.

  • ⭐⭐⭐⭐⭐

    Rachel Morgan – Denver, Colorado

    My order arrived carefully packaged and matched the description on the website. I appreciated that the product details made it easier to choose the right option before purchasing. Everything fits naturally into my home, and the overall quality and shopping experience met my expectations.

  • ⭐⭐⭐⭐⭐

    Kevin Parker – Portland, Oregon

    Aptora offers a nice selection of practical products for improving everyday spaces. The website was easy to browse, checkout was quick, and I received helpful order updates. The item I selected has been useful and looks great in the room. I am happy with my purchase overall.

FAQ

What types of products does Aptora sell?

Aptora offers compact furniture, storage solutions, lighting, textiles, home décor, and organization products designed for studio apartments, smaller rooms, and multifunctional living spaces.

How much does shipping cost?

Aptora charges a flat shipping fee of $6.90 per order. If your order is divided into multiple shipments, you will not be charged an additional standard shipping fee solely because the items ship separately.

How long will my order take to arrive?

Orders are typically processed within 1–3 business days. Estimated delivery after shipment is generally 5–10 business days within the United States and 10–20 business days for supported international destinations. These are estimates and may vary depending on the product, destination, carrier, customs processing, and other delivery conditions.

How can I track my order?

Once your order ships, we will send a shipping confirmation email with available tracking information. Tracking updates may take approximately 2–5 days to appear after shipment because of carrier processing or transfers between logistics providers.

Why did I receive only part of my order?

Products in the same order may be stored at different fulfillment locations and shipped separately. Each package may have its own tracking number and delivery date. Please review all shipping confirmation emails before reporting a missing item.

Can I change or cancel my order?

You may request an address change, order modification, or cancellation within 12 hours of purchase by emailing nioursfaseqw@gmail.com. Requests are not guaranteed because orders may enter processing shortly after they are placed. A cancellation is complete only after Aptora confirms it in writing.

What should I check before ordering furniture?

Please review the product dimensions, materials, weight capacity, assembly requirements, and included components. Measure your room, floor space, doorways, hallways, stairways, elevators, and other delivery access points before ordering. Returns caused by insufficient space or access may be treated as change-of-mind returns.

Do Aptora products require assembly?

Some furniture and storage products may require assembly, mounting, or installation. Assembly requirements are generally listed on the product page. Unless expressly stated otherwise, professional assembly and installation are not included. Always follow the supplied instructions and use qualified assistance when electrical work, wall mounting, or structural support is involved.

What is your return policy?

Eligible products may be returned within 30 calendar days of delivery. Products must generally be unused, unwashed, uninstalled, unaltered, and returned with their original packaging, accessories, hardware, and instructions. Furniture should normally remain unassembled for a change-of-mind return. Contact us before returning anything because all returns require prior written authorization.

What should I do if my item arrives damaged, defective, incorrect, or incomplete?

Email nioursfaseqw@gmail.com as soon as possible with your order number, a description of the issue, and clear photographs of the product, packaging, shipping label, and affected area. We recommend reporting visible damage within 7 calendar days of delivery. Please keep all packaging, accessories, and hardware until your claim has been reviewed.